Lemcon PM Project tracker
Not signed in
Sign-in arrives in release 1

Lemcon PM — status

pm.lemcon.app · this page proves the stack end to end · 20 Sep 2026 20:45 Manila

Stack

CheckResultDetail
PHP done 8.2.29
Stylesheet done If this page is grey with a navy bar, app.css loaded. If it is plain white, open /assets/app.css directly — 403 means permissions, 404 means the wrong extract path.
Database done Connected. MySQL 10.3.39-MariaDB
Clock done PHP: 2026-09-20 20:45:54 · Database: 2026-09-20 20:45:54
Asset version work v1 — bump this in the same edit that changes any file in assets/

House style check

Four meanings, and only meanings carry colour. Every status word in the system maps to one of these.

open work done N/A
The signature pairing
A small uppercase muted label above a plain value
Tabular figures
1,247
Escalation band, amber. It turns red once something has been ignored past its threshold — the colour change is the escalation, so no extra wording is added.